slab-to-base-material-recipe
Slab To Base Material
The Conversion Rate
4 Slab -> 1 Base Material
The Basis
3 Raw Materials yield 6 Slabs, which means the slabs/raw material is 2, which would make each slab worth 0.5 of the raw material. Since the recycling rate is 50%, this makes 0.25 raw materials per slab.
Version Available
Wood: Recyclotron 1.3.1.1 or later
Comments